Proposal:
Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam checkout, testing hexapod LUT, primary mirror LUT
Primary Investigator:
ALISTAIR WALKER
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
8
Nice night.