Proposal:
2103B-04440
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
7.25
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
Nidever
Email:
Institution:
U. Michigan
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Very strong wind with guts of up to 50 mph. We had to close the dome at 9:30pm opened again around 5:00am.