Proposal:
2012B-0001 / 2013B-0440
Target of Oportunity:
No
Time Observed:
7.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES (second half: SMASH)
Primary Investigator:
Josh Frieman / D. Nidever
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
7.5
*************************
Second part of the night very smooth