Proposal:
SMARTS
Target of Oportunity:
No
Time Observed:
7.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
D. Nidever
Email:
Institution:
U. Michigan
Instrument:
CTIO 0.9m CCD Direct
Organization:
SMARTS
Total Program Time:
7.5
Good and productive night. Thanks to Todd, Hernan and Manuel for the support.
Dewar filled at 6:30am