Proposal:
0001
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.75
TASCA seems to have stopped running on Nov 10. Douglas Tucker finds it useful to compare TASCA with RASICAM so he was wondering when it might be fixed.
Seeing was good all night and the DIMM worked consistently.