Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
f/8 engineering
Primary Investigator:
Tim Abbott
Email:
Institution:
CTIO
Instrument:
CTIO 4m ISPI
Organization:
NOAO
Total Program Time:
8.75
Performed focus sequences around the sky, with LUT for M2 on and off.
Not all data as useful as we had hoped, in particular towards the end of the night, due to clouds.
We might want to repeat some of these tests