Proposal:
2013A-9999
Target of Oportunity:
yes
Time Engineering:
10.5
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering Tests
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
Nice night, excellent seeing for much of the time. Best image 0.64 arcsec fwhm (Y band)