Proposal:
2012B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
10.5
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam & telescope engineering
Primary Investigator:
A. Walker
Email:
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
12
Program (i) primary miurror 4MAP tests (ii) u band star flats (iii) Regression suite