Proposal:
2013A-0529
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
3.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Blanco DECam Bulge Survey
Primary Investigator:
R. Michael Rich
Email:
Institution:
UCLA
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.5
Guider problem as described above. Occasional failure to set up guide stars in some fields.