Proposal:
2102B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
9.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
9
Completed:
1. Bright star scattering test for new g filter baffle - success!
2. Regression test suite
3. crosstalk data set (although CCDs S29, S31, S32 bottom and CCDs N29, N30 and N31 top need redoing.