Proposal:
2013A-0327
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
lightechos
Primary Investigator:
Dr. Rest
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
5
None.