Proposal:
2013A-0714
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
An i-band Survey of the Equatorial Sky for MS-DESI
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5
The 9:01 PM TCS failure, which had occurred on two previous nights, did not recur.
Alberto made some adjustments to the louvres and wind screen around 6:45 UTC. This may have improved the seeing, from 1.4" to 1.1", for the next two hours.