Proposal:
2013A-0360
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
4.0
Time lost other:
0.0
Primary Investigator:
von der Linden
Email:
Institution:
KIPAC
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.5
None.
---- 2nd half:
- Lost due to humidity.