Proposal:
2012B-0003
Target of Oportunity:
No
Time Observed:
0.5
Time Engineering:
0.0
Time lost technical:
3.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
des sv
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
4
2nd half:
- Had to figure out how to reset hexapod to standard configuration.
- Seeing briefly below 0.8"
- Cirrus clouds from ~4:30
- Wind from the south