Proposal:
engineering
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
2.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
M1 and donuts, guider tests, etc
Primary Investigator:
A. Walker, D. Holck
Instrument:
CTIO 4m DECam
Total Program Time:
6
None.