Proposal:
2012B-0003
Target of Oportunity:
No
Time Observed:
4.5
Time Engineering:
0.0
Time lost technical:
3.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SV-Extended
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.5
Crude estimate for time lost due to technical- telescope jumps and oscillations.