Proposal:
2025A-388357
Target of Oportunity:
No
Time Observed:
4.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Narayan-Rest
Email:
gsn@illinois.edu [1]
Institution:
University of Illinois Urbana-Champaign
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
4.5

SISPI interlock was broken at the end of night. TO on site, Robert Aviles fixed it immediately.