Proposal:
2023B-646244
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
5.0
Time lost other:
5.0
Description:
MAGIC Survey
Primary Investigator:
Ani Chiti
Email:
Institution:
University of Chicago
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10

High humidity most of the night, plus very poor seeing when we did open the dome (briefly).
There were periods -- about half the night -- where we could have openned the dome, however the seeing was typically >2.5" on the seeing monitor and we chose not to observe as all of those poor quality data would have be essentially useless to our science case.