Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
4.5
Time lost technical:
0.0
Time lost weather:
3.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
A. Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.5
The telescope stayed closed for the first 3hrs because of clouds. At 22:00 LT the StarFlats scirpt was used. At the time the sky was mostly clear but probably not photometric. StarFlats were executed unlt 2:30 LT waiting for the GPAN error to appear but it did not. At 2:30LT we switched to a science program for the rest of the night .