Proposal:
2024A-824140
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
5.5
Time lost other:
0.0
Description:
DECAT
Primary Investigator:
Brucker
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5.5
overcast