CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2024-06-29

ENR CTIO Blanco 4-m 2024-06-29

Date: 
Saturday, June 29, 2024
Telescope: 
CTIO Blanco 4-m
Submitter: 
Eshwar Puvvada, Ian Dell'Antonio
Submitter Email: 
epuvvada@purdue.edu
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
Guillermo Damke, Alfredo Zenteno, Yuanyuan Zhang, Yu-Hsiu Huang, Shenming Fu, Soren Helhoski, Jess Nelson, Anthony Englert
Problems: 

Lower dome shuter still stuck

Comments: 

None.

Conditions: 
General Conditions
Temperature Max: 
16.00
Temperature Min: 
11.00
Humidity Max: 
21
Humidity Min: 
20
Wind Speed Max: 
18.00
Wind Speed Min: 
6.70
Comment: 
None.
1st Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.15
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky : 
0
2nd Quarter
Clouds: 
Clear
Wind: 
Medium
Seeing Value: 
1.35
Seeing Variability: 
0.2
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.20
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Seeing Value: 
1.00
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
  • Delete
  • Edit
Program: 
Proposal: 
2023B-184194
Target of Oportunity: 
No
Time Observed: 
5.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.25
Description: 
IBIS
Primary Investigator: 
David Schlegel
Email: 
djschlegel@lbl.gov [1]
Institution: 
Lawrence Berkeley National Laboratory
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5.75
  • Delete [2]
  • Edit [3]
Proposal: 
2024A-756490
Target of Oportunity: 
No
Time Observed: 
5.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Constructing a Complete Reference Set of Local Galaxy Cluster Properties
Primary Investigator: 
Ian Dell'Antonio
Email: 
ian_dell'antonio@brown.edu [4]
Institution: 
Brown University
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5.75
  • Delete [5]
  • Edit [6]
  • Add [7]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2024-06-29 11.25 0.0 0.0 0.0 0.25 11.5

Source URL (modified on 06/30/2024 - 06:51): http://www.ctio.noao.edu/noao/content/ENR-CTIO-Blanco-4-m-2024-06-29

Links
[1] mailto:djschlegel@lbl.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43530/delete?destination=print/node/21741
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43530/edit?destination=print/node/21741
[4] mailto:ian_dell'antonio@brown.edu
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43531/delete?destination=print/node/21741
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/43531/edit?destination=print/node/21741
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/21741?destination=print/node/21741