Proposal:
2023B-184194
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
2.0
Time lost other:
0.0
Description:
IBIS
Primary Investigator:
Dey, Schlegel
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5.75
None.