Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5
At 18:55 UT conection between telescope and CHIRON is down. Reecovered BUT, in TCS EPOCH is 2023 (should be 2020): can't change because is password protected.
RINGSS and the Pachon DIMM monitor are down so, there is no seeing data.
File 1164 'lambda Pav' star moved ~ 20 ["] to the North. Some thin clouds but last quarter of night was the clearest. The program was completed.