Proposal:
2023A-881453
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
9.25
Time lost other:
0.0
Description:
DESIRT: DECam Survey for Intermediate-redshift Transients
Primary Investigator:
Palmese, Wang
Email:
palmese@cmu.edu [1]
Institution:
Carnegie-Mellon University
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Observations started around 4am local time. We were instructed to stop by 6am, but telescope operator said they still had to stay so we finished the scheduled exposures a few minutes after 6am.