Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
Program almost completed, one target couldn't be observded.
DIMM didn’t work in the following time ranges: 23:40- 1:10 UT, and 1:30- 2:05 UT.
Poor seeing during the first quarter of the night, low signal for fainter targets.
T0261257684 observed with very poor seeing (2.6 arcsec).
TIC5981829 couldn't be reached at 0:45UT, the telescope would not move, too close or within the telescope’s limits. First observation started at 01:41 UT. Second observation started at 5:17UT
TIC7211118 couldn't be observed as it was beyond the telescope’s limits within the required time window.