Proposal:
Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
2.25
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Alistar Walker
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
2.25
None.