Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.25
DIMM data gaps: 03:15 - 04:54, 05:10 - 05:33 UT. Used Pachon DIMM as a reference.
File 1119 looks as a 'white' frame but it is ok. Then @ 01:00 UT optgui frozen! Rebooted, ok.
Last integration ('gamma Vel') completed with the Sun at -6.3 degrees of altitude.