Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.5
Tololo's DIMM stops at 06:55 UT ('again'!), last quarter used Pachon's DIMM sensor.
Underline : 'all these nights' Tololo's DIMM has been stopping earlier than the end of the night, before the Sun reaches -10 degrees of altitude.
Bad seeing tonight's, in the the range 1.1 - 3.6 ["], err bars bigger than those in the report.
Completed the program with the Sun at -9.8 degrees of altitude.