Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.5
Tololo's DIMM started collecting data at 03:26 UT and stopped at 06:00 UT.
Program completed with the Sun at -11.1 degrees of altitude.