Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.25
Thanks so much to Jacqueline Ceron for the cleaning of the 1.5m mirrors.
DIMM data gap: 00:25 - 00:51 UT.
DIMM down at 03:20 UT (clear, slow winds.) Used the Pachon DIMM as reference.
RKS0600-3101AB : pointed to the S component, used N as a guide.
Last integration of 'gamma Vel' completed with the Sun at -10.3 degrees of altitude.