Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.25
DIMM data gaps: 04:37 - 05:05, 06:47 - 06:55 UT (wind!)
RKS0343-6116 : 60[s] added to compensate a telescope movement.
Connection NOS-CHIRON/TCS worked for less than one hour: manual operation of system.
Completed the program with the Sun at -13.7 degrees of altitude.