Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
6.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
11.5
ctimac3 unreachable, aproblem at the Atlanta side: so, manual operation of the system.
Overcast, No DIMM after 4UT.
02:38 UT G2K001908, telescope moved East ~ 20 ["]. Added 20[s] to compensate.
4 UT overcast, last object observed: HIP113673 ; and then closed dome and covered the mirror, dome looking North.