Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
6.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
5.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5
Last integration ('G2K002212') completed with the Sun at -8.8 degrees of altitude.