Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.25
A065317 file 1126, a double system: cannot resolve so both are in the fiber.
Tololo DIMM down: used Pachon seeing monitor as a reference.
Completed the program with the Sun at - 12.3 degrees of altitude.