Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
ThAr Slicer lamp ~ 1.7-1.9E6 EM 'counts': last shift it was ~ 2.2E6 EM 'counts' ('EMAVGSQ')
(same to fiber lamps: less counts than observed the previous shift.)
ASASSN-V J095846.87-4439 has a faint N companion, out of the fiber.
All the program.