Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
T0081247740 is due North so, observed it but ~ 45 minutes later than requested (dome!)
DIMM stops at 09:12 UT (?) Even though winds were low there are some blanks in the data.
Completed last integration of 'G2K001796' with the Sun at -12.5 degrees of altitude.