Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.75
No time for 'T CrB'.
Last integration -G2K001710- completed with the Sun at -9.3 degrees of altitude.