Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5
No time for T0146172354 and HIP054418.
>> Last integration 'LN Mus' completed with the Sun at -6.4 degrees of altitude <<