Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Leauthaud
Email:
alexie@ucsc.edu [1]
Institution:
University of California, Santa Cruz
Instrument:
CTIO 4m DECam
Total Program Time:
4

Power outage caused loss of tracking, leading to need to recover from and to reset camera V_sub after discovered that initial zeros and first exposure (having missed that initial zeros were abnormal) after power outage recovery were junk.