Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.25

Please reschedule: TYC_7102-426-1, TYC_8147-1020-1 and T0262258341 because only got ONE integration (file 1169) which was completed with the Sun at -8.9 degrees of altitude.