Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
12.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12.25

- DIMM down between 06:48 and 07:43 UT and again between 07:46 and 08:06 UT.
- No time for 'TOI-2303'
- Completed last integration on '' with the Sun at -8.9 degrees of altitude.