Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
12.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12

Last integration on 'CD-86_147' completed with the Sun at -12.0 degrees of altitude.