Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5

- No time for extras TIC 372346776 and HD209290.
- Last integration ended with the Sun at -10.2 degrees of altitude.