Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.5

- HIP057099 Added extra time (300s) to compensate for some poor guiding.
- 09:28 UT, guiding problems on V1280 Sco , telescope drifts E. Might be a BALANCE issue? RA=16 57 40.800 DEC=-32 20 36.240 HA=2H 21min E Airmass=1.16. To compensate added 200 s to the requested integration time (so 1200 instead of 1000 s.)
- Completed last integration on V1280 Sco with the Sun at -9.1 degrees of elevation.