Proposal:
2020B-0201
Target of Oportunity:
No
Time Observed:
6.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
1.5
Time lost other:
0.0
Primary Investigator:
Soo Lee
Email:
Institution:
Purdue University
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5

Seeing was highly variable between 1.0 - 1.85arcsec measured from the science image (DIMM = 0.9 2.5arsec). In the time report below, we reported that 1.5h is lost due to weather corresponding to the period of seeing > 1.6arcsec.