Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9

- DIMM seeing reached 2.8", so, at 04:15 UT astronomers requested to observe only the brightest stars of the (updated) list and double their exposures times.
- For Alpha Cen B did 35 integrations.
- Last (25') integration on G2K001290 (a bad choice? It have a bright companion ES of it as shown in CDS charts) ended with the Sun at -9.8 degrees of altitude.