Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

- 05:46 UT While on SR3, a very smooth earthquake.
- Got a 600 s extra integration of G2K001275, making time to observe Alpha Cen B.
- Ended at 09:17 UT with the Sun at -9 degrees of elevation.