Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

Since Tololo and Pachon DIMM seeing monitors are down, tried GEMINI South but is not working either! The DIMM is doomed! Damn!
- Added G2K000950, both components, 540 [s] each (~ 26K counts), + ThAr lamp.
- Completed last integration with the Sun at -9.0 degrees of altitude.