Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

- 00:40 UT object "oscillates" up and down, N-S: manually kept it in the box.
- No time for: TOI-1478, PMM665, PMM5884, PMM2012.
- Last integration completed with the Sun at -11.2 degrees of elevation.