Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10

Completed all the program
01:02 UT fails to start integration on T0409, rebooted chiron (err messsage port 4325...) ok.
06:25 UT While requested move from ADS9909AB to C, TCS reported DOME OFF and 'LIMITS' even though it was not in trouble. Are these HW Limit Switches or SW?